For Whom The Bell Tolls! 5 New Toll Roads Approved in the Austin Area!
October 25th, 2007 Categories: Dripping Springs Real Estate News
CAMPO Board Approved 5 new toll roads set to begin in 2009 and be completed in 2011.
1. US 290 from east of IH – 35 to east of SH 130 (6.2 miles, $504 million) six lane toll way with frontage roads and multi – level interchange at US 183.
2. US 183S from Springdale Road to 71 E (7.2 miles, $305 million) Six lane non-toll or toll controlled access facility with frontage roads.
3. SH 71E from west of Riverside to Presidential Blvd. (1.2 miles, $153 million) Four lane non-toll or toll controlled access facility with frontage roads and multi -level interchange at US 183.
4. ‘Y” at Oak Hill (2.9 miles, $411 million) Elevated 6 lane toll way with frontage road and a elevated interchange.
5. SH 45 SW from Loop 1 to FM 1626 (3.6 miles, $76 million) Four lane toll controlled access facility and two non-toll lanes.
For a map of the proposed roads
This latest update brought to you by Jeremy K. Frost ~ REALTOR & “Real Estate Blogster” 512–636–2746
No Comments yet »
RSS feed for comments on this post. TrackBack URI








